- Industry
- Warehouses & Industrial
- Location
- Al Quoz, Dubai
- Duration
- 6 weeks
The challenge
Operations could not stop; temperatures inside exceeded safe working limits.
Our solution
Zoned replacement in six phases with temporary cooling maintained throughout.
Result
Energy consumption reduced by an estimated 22% annually.